EV charging site
BMW Cowley
Horspath Road, Cowley, OX4 6NL
BMW Cowley is an EV charging site in Cowley, Oxfordshire. Its 7 sockets reach up to 50 kW, with CCS at the top speed. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Blackbird Leys Leisure Centre (Blink Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.20 + £1.00/hour connected; other tariffs available(from Open Charge Map, 5 Jun 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at BMW Cowley?
The listed price is £1.20 + £1.00/hour connected; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at BMW Cowley?
Up to 50 kW DC via Type 2, BS1363 3 Pin 13 Amp, CCS, CEE 7/5.
How many charging sockets does BMW Cowley have?
7 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 50 kW CCS, 1 × 4 kW CEE 7/5, 1 × 22 kW Type 2.
Where is the nearest other charger with 50 kW or more to BMW Cowley?
Blackbird Leys Leisure Centre (Blink Charging) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at BMW Cowley?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BMW Cowley?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at BMW Cowley?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- John Smith Drive
- Pod Point Tesco Superstore - Oxford
- Between Town Road
- Blackbird Leys Leisure Centre
- Stapleton Road
- Rose Hill Community Centre
- Cheapest nearby
- Pod Point Tesco Superstore - Oxford · 44.4p per kWh · 7 kW · 0.6 mi