# Borrowdale Gates Hotel

Web page: https://ampmap.co.uk/charger/borrowdale-gates-hotel-uk

Borrowdale Gates Hotel is an EV charging site in Keswick, Cumbria, run by Borrowdale Gates Hotel and open 24 hours a day. Both of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 100% uptime and recorded 21 charging sessions here over the last 30 days.

## Status

Offline at 22 Nov 2026, 15:00 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Borrowdale Gates Hotel, CA12 5UQ
- **Area:** Keswick, Cumbria, United Kingdom
- **Coordinates (latitude, longitude):** 54.54919, -3.15941

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed | Status unknown |

## Site information

- **Operator:** Borrowdale Gates Hotel
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Borrowdale Gates Hotel?

Up to 7 kW AC via Type 2.

### How many charging sockets does Borrowdale Gates Hotel have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is Borrowdale Gates Hotel open 24/7?

Yes - Borrowdale Gates Hotel is open 24 hours a day, 7 days a week.

### When is Borrowdale Gates Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 10 am. The live status on this page shows what is free before you set off.

### How reliable is Borrowdale Gates Hotel?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 21 observed charging sessions.

### Who operates Borrowdale Gates Hotel?

Borrowdale Gates Hotel is on the Borrowdale Gates Hotel network.

### How long does a Tesla Model Y Long Range take to charge at Borrowdale Gates Hotel?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Borrowdale Gates Hotel?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Borrowdale Gates Hotel?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Keswick](https://ampmap.co.uk/chargers/united-kingdom/cumbria/keswick)

## Chargers near this site

- [Leiths Head Hotel · ChargePoint](https://ampmap.co.uk/charger/chargepoint-leiths-head-hotel-uk) - Type 2 22 kW · Borrowdale Valley
- [Pod Point The Royal Oak Hotel](https://ampmap.co.uk/charger/pod-point-the-royal-oak-hotel-uk) - Type 2 7 kW · Royal Oak Hotel Borrowdale · From 50.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/borrowdale-gates-hotel-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Borrowdale Gates Hotel (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
