BP Pulse · EV charging site
1-7 Tripps Yard
1-7 Tripps Yard, Hepworth Road, Thetford, IP31 2FR
1-7 Tripps Yard is an EV charging site in Thetford, Norfolk, run by BP Pulse. It has a single 7 kW Type 2 socket. Amp Map measured 0% uptime here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG BP West Suffolk (MFG EV Power), 7.3 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- VPP402001
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 1-7 Tripps Yard (BP Pulse)?
Up to 7 kW AC via Type 2.
How many charging sockets does 1-7 Tripps Yard (BP Pulse) have?
1 charging socket: 1 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is 1-7 Tripps Yard (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates 1-7 Tripps Yard?
1-7 Tripps Yard is on the BP Pulse network.
Where is the nearest charger with 50 kW or more to 1-7 Tripps Yard (BP Pulse)?
MFG BP West Suffolk (MFG EV Power) is 7.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 1-7 Tripps Yard (BP Pulse)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 1-7 Tripps Yard (BP Pulse)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 1-7 Tripps Yard (BP Pulse)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.