BP Pulse · EV charging site
15 Watford Way
A41, Golders Green, NW4 3JL
15 Watford Way is an EV charging site in Golders Green, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 92% uptime and recorded 138 charging sessions here over the last 30 days. 19 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 240 Hendon Way (BP Pulse), 0.1 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT602
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 15 Watford Way (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does 15 Watford Way (BP Pulse) have?
2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is 15 Watford Way (BP Pulse) open 24/7?
Yes - 15 Watford Way (BP Pulse) is open 24 hours a day, 7 days a week.
When is 15 Watford Way (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is 15 Watford Way (BP Pulse)?
Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 138 observed charging sessions.
Who operates 15 Watford Way?
15 Watford Way is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to 15 Watford Way (BP Pulse)?
240 Hendon Way (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 15 Watford Way (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 15 Watford Way (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 15 Watford Way (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.