# 201 Green Lane · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-201-green-lane-uk

201 Green Lane is an EV charging site in Eltham, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 99% uptime and recorded 183 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 19:02 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Greenwich, SE9 3SZ
- **Area:** Eltham, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.43592, 0.06307

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at 201 Green Lane (BP Pulse)?

Up to 50 kW DC via CCS.

### How many charging sockets does 201 Green Lane (BP Pulse) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

### Is 201 Green Lane (BP Pulse) open 24/7?

Yes - 201 Green Lane (BP Pulse) is open 24 hours a day, 7 days a week.

### When is 201 Green Lane (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 5 pm. The live status on this page shows what is free before you set off.

### How reliable is 201 Green Lane (BP Pulse)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 183 observed charging sessions.

### Who operates 201 Green Lane?

201 Green Lane is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at 201 Green Lane (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 201 Green Lane (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at 201 Green Lane (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Eltham](https://ampmap.co.uk/chargers/united-kingdom/greater-london/eltham)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Shell Recharge Shell Sidcup](https://ampmap.co.uk/charger/shell-recharge-shell-sidcup-uk) - CCS / CHAdeMO 150 kW · 728 Sidcup Road · From 89p/kWh
- [741 Sidcup Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-741-sidcup-road-uk) - CCS 50 kW · 741 Sidcup Road
- [Southwood Road · Total Energies](https://ampmap.co.uk/charger/total-energies-southwood-road-uk) - Type 2 7 kW, J-1772 3 kW · Southwood Road
- [William Barefoot Drive · Total Energies](https://ampmap.co.uk/charger/total-energies-william-barefoot-drive-uk) - Type 2 7 kW · William Barefoot Drive
- [Shell Footscray · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-shell-footscray-uk) - CCS 50 kW, CHAdeMO 50 kW · 176 Footscray Road
- [ubitricity Distributed Energy Systems UK Ltd. 42 Frensham Road](https://ampmap.co.uk/charger/ubitricity-42-frensham-road-uk) - Ubitricity · Type 2 5 kW · 42 Frensham Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-201-green-lane-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
