Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Ashland Lakes

Ashlands Lakes Car Park, Penshurst Cres, Ashl, Bletchley, MK6 4AN

Ashland Lakes is an EV charging site in Bletchley, Milton Keynes, run by BP Pulse. Its 6 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 76% uptime and recorded 2 charging sessions here over the last 30 days. 15 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Plough, Milton Keynes (Osprey Charging), 0.2 miles away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS or CHAdeMO · 50 kW1 connector · 89p per kWhOut of service
249580% reliabilityOut of order
CCS or CHAdeMO or Type 2 · 50 kW1 connector · 89p per kWh1 in use
24957100% reliabilityBlocked
Type 2 · 7 kW4 connectors · 65p per kWh4 free
13555100% reliabilityAvailable
13555100% reliabilityAvailable
13575100% reliabilityAvailable
13575100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
13555

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 244 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Ashland Lakes (BP Pulse)?

The listed price is CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.65/kWh · Type 2 £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Ashland Lakes (BP Pulse)?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Ashland Lakes (BP Pulse) have?

6 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 4 × 7 kW Type 2, 1 × 44 kW Type 2. Live per-socket availability is shown on this page.

When is Ashland Lakes (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 11 am. The live status on this page shows what is free before you set off.

How reliable is Ashland Lakes (BP Pulse)?

Amp Map measured 76% uptime here from recorded live status over the last 30 days, across 2 observed charging sessions.

Who operates Ashland Lakes?

Ashland Lakes is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Ashland Lakes (BP Pulse)?

The Plough, Milton Keynes (Osprey Charging) is 0.2 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Ashland Lakes (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ashland Lakes (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ashland Lakes (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.