Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Beaufort Park Hotel

Beaufort Park Hotel, New Brighton, Buckley, CH7 6RG

Beaufort Park Hotel is an EV charging site in Buckley, County of Flintshire, run by BP Pulse. All 4 of its sockets are 50 kW CCS and CHAdeMO, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 98% uptime and recorded 131 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Mold, 0.3 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW3 connectors · 89p per kWh3 free
BPT06298% reliabilityAvailable
BPT06394% reliabilityAvailable
BPT06394% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 89p per kWh1 free
BPT06298% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
BPT062

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Beaufort Park Hotel (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Beaufort Park Hotel (BP Pulse)?

Up to 50 kW DC via CCS, CHAdeMO.

How many charging sockets does Beaufort Park Hotel (BP Pulse) have?

4 charging sockets: 3 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

When is Beaufort Park Hotel (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Beaufort Park Hotel (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 131 observed charging sessions.

Who operates Beaufort Park Hotel?

Beaufort Park Hotel is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Beaufort Park Hotel (BP Pulse)?

Shell Recharge Shell Mold is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Beaufort Park Hotel (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beaufort Park Hotel (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Beaufort Park Hotel (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.