Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Bedford Swan Hotel

Bedford Swan Hotel , The Embankment, MK40 1RW

Bedford Swan Hotel is an EV charging site in Bedford, run by BP Pulse. Its 3 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 0% uptime here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Starbucks St Johns Retail Park, Bedford (Osprey Charging), 0.4 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW1 connector · 89p per kWhOut of service
UC251060% reliabilityOut of order
Type 2 · 7 kW2 connectors · 65p per kWhOut of service
149660% reliabilityOut of order
149660% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
14966

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Bedford Swan Hotel (BP Pulse)?

The listed price is CCS £0.89/kWh · Type 2 £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Bedford Swan Hotel (BP Pulse)?

Up to 50 kW DC via CCS, Type 2.

How many charging sockets does Bedford Swan Hotel (BP Pulse) have?

3 charging sockets: 1 × 50 kW CCS, 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Bedford Swan Hotel (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Bedford Swan Hotel (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Bedford Swan Hotel?

Bedford Swan Hotel is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Bedford Swan Hotel (BP Pulse)?

Starbucks St Johns Retail Park, Bedford (Osprey Charging) is 0.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Bedford Swan Hotel (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bedford Swan Hotel (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bedford Swan Hotel (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.