BP Pulse · EV charging site
Blackbird Hill SF Connect
2 Blackbird Hill, Wembley, NW9 8SD
Blackbird Hill SF Connect is an EV charging site in Wembley, Greater London, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. 30 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is 21 Bridge Road (ESB Energy), 0.6 miles away.
Status
Not reporting
Checking status…
Connectors
CCS · 150 kW
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000463
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Blackbird Hill SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Blackbird Hill SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Blackbird Hill SF Connect (BP Pulse) open 24/7?
Yes - Blackbird Hill SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
Who operates Blackbird Hill SF Connect?
Blackbird Hill SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Blackbird Hill SF Connect (BP Pulse)?
21 Bridge Road (ESB Energy) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Blackbird Hill SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Blackbird Hill SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Blackbird Hill SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Verney Street
- ubitricity Distributed Energy Systems UK Ltd. 13A Wells Drive
- ubitricity Distributed Energy Systems UK Ltd. 9 Wells Drive
- ubitricity Distributed Energy Systems UK Ltd. 5 Wells Drive, opp.
- Lycée International de Londres Winston Churchill
- 21 Bridge Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 13A Wells Drive · 45p per kWh · 5 kW · 0.4 mi