# Bovey SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-bovey-sf-connect-uk

Bovey SF Connect is an EV charging site in Newton Abbot, Devon, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around noon, and Amp Map measured 98% uptime and recorded 104 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 18:44 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Newton Rd, TQ12 6SJ
- **Area:** Newton Abbot, Devon, United Kingdom
- **Coordinates (latitude, longitude):** 50.57119, -3.66025

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Bovey SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Bovey SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Bovey SF Connect (BP Pulse) open 24/7?

Yes - Bovey SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Bovey SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Bovey SF Connect (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 104 observed charging sessions.

### Who operates Bovey SF Connect?

Bovey SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Bovey SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bovey SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bovey SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newton Abbot](https://ampmap.co.uk/chargers/united-kingdom/devon/newton-abbot)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Pod Point Tesco Superstore - Newton Abbot](https://ampmap.co.uk/charger/pod-point-tesco-superstore-newton-abbot-2-uk) - Type 2 7 kW · Newton Road · From 44.4p/kWh
- [Chudleigh Library Car Park · POGO](https://ampmap.co.uk/charger/pogo-charge-chudleigh-library-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Chudleigh Library Car Park · From 56p/kWh
- [Project EV Charging Station](https://ampmap.co.uk/charger/project-ev-charging-station-uk) - Type 2 7 kW · 12 St Paul's Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-bovey-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
