# HRL Belfast Road · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-bp-belfast-road-uk

HRL Belfast Road is an EV charging site in Bangor, Ards and North Down, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 96% uptime here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 13:37 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 139-141 Belfast Road, BT20 3PP
- **Area:** Bangor, Ards and North Down, United Kingdom
- **Coordinates (latitude, longitude):** 54.65549, -5.68407

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at HRL Belfast Road (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does HRL Belfast Road (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is HRL Belfast Road (BP Pulse) open 24/7?

Yes - HRL Belfast Road (BP Pulse) is open 24 hours a day, 7 days a week.

### When is HRL Belfast Road (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is HRL Belfast Road (BP Pulse)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days.

### Who operates HRL Belfast Road?

HRL Belfast Road is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at HRL Belfast Road (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Belfast Road (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at HRL Belfast Road (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bangor](https://ampmap.co.uk/chargers/united-kingdom/ards-and-north-down/bangor)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Solo Clandeboye · Weev](https://ampmap.co.uk/charger/weev-solo-clandeboye-uk) - CCS 120 kW · 173 Clandeboye Rd
- [Toscana Retail Park · Weev](https://ampmap.co.uk/charger/weev-toscana-retail-park-uk) - CCS 120 kW, CHAdeMO 120 kW · Toscana Park
- [Bangor Aurora Aquatic & Leisure Complex · EZO (IE)](https://ampmap.co.uk/charger/ezo-bangor-aurora-aquatic-and-leisure-complex-uk) - CHAdeMO 75 kW, CCS 50 kW · Valentine Road
- [Aurora Car Park Bangor](https://ampmap.co.uk/charger/aurora-car-park-bangor-uk) - Type 2 7 kW · Aurora Car Park
- [Bingham Lane · Weev](https://ampmap.co.uk/charger/weev-bingham-lane-uk) - Type 2 22 kW · Bingham Lane
- [Quay Street Car Park · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-quay-street-car-park-uk) - Type 2 22 kW · 30 Quay Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-bp-belfast-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
