# BP Building E Undercroft Car Park · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-bp-building-mscp-undercroft-car-park-uk

BP Building E Undercroft Car Park is an EV charging site in Ashford, Surrey, run by BP Pulse. Its 5 sockets reach up to 7 kW, with Type 2 at the top speed, and the published price is £0.65 per kWh. Amp Map measured 0% uptime here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 22:35 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** BP Building E Undercroft Car Park, Internatio, TW13 4RL
- **Area:** Ashford, Surrey, United Kingdom
- **Coordinates (latitude, longitude):** 51.42775, -0.43226

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | £0.65/kWh | Out of service |
| Type 2 | 4 kW | 3 | £0.65/kWh | Out of service |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Not published
- **Payment:** In the BP Pulse app; RFID card

## Common questions

### How much does it cost to charge at BP Building E Undercroft Car Park (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at BP Building E Undercroft Car Park (BP Pulse)?

Up to 7 kW AC via Type 2.

### How many charging sockets does BP Building E Undercroft Car Park (BP Pulse) have?

5 charging sockets: 2 × 7 kW Type 2, 3 × 4 kW Type 2. Live per-socket availability is shown on this page.

### How reliable is BP Building E Undercroft Car Park (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

### Who operates BP Building E Undercroft Car Park?

BP Building E Undercroft Car Park is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at BP Building E Undercroft Car Park (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at BP Building E Undercroft Car Park (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at BP Building E Undercroft Car Park (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ashford](https://ampmap.co.uk/chargers/united-kingdom/surrey/ashford)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Texaco Herds Garage · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-texaco-herds-garage-uk) - CCS 50 kW, CHAdeMO 50 kW · Staines Road West
- [Ashford SF Connect · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-ashford-sf-connect-uk) - CCS 150 kW · Staines Road West
- [Pod Point Tesco Extra - Sunbury-On-Thames](https://ampmap.co.uk/charger/pod-point-tesco-extra-sunbury-on-thames-uk) - Type 2 7 kW · Escot Road · From 44.4p/kWh
- [Costco · Chargemaster](https://ampmap.co.uk/charger/chargemaster-costco-uk) - Type 2 7 kW · Hanworth Road
- [ubitricity Distributed Energy Systems UK Ltd. 8 Raleigh Road, Outside 8](https://ampmap.co.uk/charger/ubitricity-8-raleigh-road-outside-8-2-uk) - Ubitricity · Type 2 5 kW · 8 Raleigh Road, Outside 8 · From 45p/kWh
- [Raleigh Road · SureCharge](https://ampmap.co.uk/charger/surecharge-raleigh-road-uk) - Type 2 4 kW · Raleigh Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-bp-building-mscp-undercroft-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
