# Oakfield SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-bp-oakfield-sf-connect-uk

Oakfield SF Connect is an EV charging site in Hitchin, Hertfordshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 98% uptime here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 18:54 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Stevenage Road, SG4 9DT
- **Area:** Hitchin, Hertfordshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.94062, -0.26948

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Oakfield SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Oakfield SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Oakfield SF Connect (BP Pulse) open 24/7?

Yes - Oakfield SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Oakfield SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Oakfield SF Connect (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days.

### Who operates Oakfield SF Connect?

Oakfield SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Oakfield SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oakfield SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Oakfield SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hitchin](https://ampmap.co.uk/chargers/united-kingdom/hertfordshire/hitchin)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Woodside Car Park](https://ampmap.co.uk/charger/woodside-car-park-uk) - Type 2 7 kW · Walsworth Road
- [Woodside Carpark Walsworth · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-woodside-carpark-walsworth-uk) - Type 2 7 kW · Woodside Carpark Walsworth
- [Lairage Car Park](https://ampmap.co.uk/charger/lairage-car-park-uk) - Type 2 7 kW · Bedford Road
- [Lairaige Multi Storey Car Park · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-lairaige-multi-storey-car-park-uk) - Type 2 7 kW · Bedford Road
- [Lairaige Multi Storey Carpark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-lairaige-multi-storey-carpark-uk) - Type 2 7 kW · Lairaige Multi Storey Carpark
- [Shell Recharge EV Waitrose - Hitchin](https://ampmap.co.uk/charger/shell-recharge-ev-waitrose-hitchin-uk) - CCS 150 kW, CHAdeMO 75 kW · The Lairage, Bedford Rd · From 79p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-bp-oakfield-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
