# HRL Rosevale · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-bp-rosevale-uk

HRL Rosevale is an EV charging site in Newtownards, Ards and North Down, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around noon, and Amp Map measured 96% uptime and recorded 218 charging sessions here over the last 30 days.

## Status

1 of 2 open at 22 Nov 2026, 15:48 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Newtownards, BT23 7BY
- **Area:** Newtownards, Ards and North Down, United Kingdom
- **Coordinates (latitude, longitude):** 54.59566, -5.68701

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | 1 free, 1 out of service |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at HRL Rosevale (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does HRL Rosevale (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is HRL Rosevale (BP Pulse) open 24/7?

Yes - HRL Rosevale (BP Pulse) is open 24 hours a day, 7 days a week.

### When is HRL Rosevale (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is HRL Rosevale (BP Pulse)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 218 observed charging sessions.

### Who operates HRL Rosevale?

HRL Rosevale is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at HRL Rosevale (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Rosevale (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at HRL Rosevale (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newtownards](https://ampmap.co.uk/chargers/united-kingdom/ards-and-north-down/newtownards)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Ann Street Car Park · Weev](https://ampmap.co.uk/charger/weev-ann-street-car-park-uk) - Type 2 22 kW · Ann St
- [West Street Car Park · Weev](https://ampmap.co.uk/charger/weev-west-street-car-park-uk) - Type 2 22 kW · West St
- [Londonderry Park · EZO (IE)](https://ampmap.co.uk/charger/ezo-londonderry-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Portaferry Road
- [Ards Blair Mayne Wellbeing & Leisure Complex · EZO (IE)](https://ampmap.co.uk/charger/ezo-ards-blair-mayne-wellbeing-and-leisure-complex-uk) - CCS 75 kW, CHAdeMO 75 kW · Dairy Hall Lane
- [Ards Hospital · Weev](https://ampmap.co.uk/charger/weev-ards-hospital-2-uk) - Type 2 22 kW · 24- 32 Frederick Street
- [Lidl · EZO (IE)](https://ampmap.co.uk/charger/ezo-lidl-8-uk) - Type 2 22 kW · Castlebawn Roundabout

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-bp-rosevale-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
