Bradley Lane Park & Ride is an EV charging site in Wednesbury, Sandwell, run by Be.EV and open 24 hours a day. Both of its sockets are 7 kW Type 2, and the published price is £0.64 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Black Country Route (GeniePoint), 0.9 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 64p per kWh2 free
AD00919-1100% reliabilityAvailable
AD00919-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
AD00919-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW64p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£35
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£27
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Bradley Lane Park & Ride (Be.EV)?

The listed price is £0.64/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Bradley Lane Park & Ride (Be.EV)?

Up to 7 kW AC via Type 2.

How many charging sockets does Bradley Lane Park & Ride (Be.EV) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Bradley Lane Park & Ride (Be.EV) open 24/7?

Yes - Bradley Lane Park & Ride (Be.EV) is open 24 hours a day, 7 days a week.

When is Bradley Lane Park & Ride (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Bradley Lane Park & Ride (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

Who operates Bradley Lane Park & Ride?

Bradley Lane Park & Ride is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Bradley Lane Park & Ride (Be.EV)?

Black Country Route (GeniePoint) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Bradley Lane Park & Ride (Be.EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£35 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bradley Lane Park & Ride (Be.EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Bradley Lane Park & Ride (Be.EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.