Fuuse · EV charging site
Chaplin Street Car Park
Chaplin Street, Lincoln, LN5 7RN
Chaplin Street Car Park is an EV charging site in Lincoln, Lincolnshire, run by Fuuse. It has a single 7 kW Type 2 socket, and the price is listed as £0.50/kWh. 24 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Instavolt, Mc Donalds (InstaVolt Ltd), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- £0.50/kWh(from Open Charge Map, 25 Apr 2026)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Chaplin Street Car Park (Fuuse)?
The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Chaplin Street Car Park (Fuuse)?
Up to 7 kW AC via Type 2.
How many charging sockets does Chaplin Street Car Park (Fuuse) have?
1 charging socket: 8 × 7 kW Type 2.
Who operates Chaplin Street Car Park?
Chaplin Street Car Park is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to Chaplin Street Car Park (Fuuse)?
Instavolt, Mc Donalds (InstaVolt Ltd) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Chaplin Street Car Park (Fuuse)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chaplin Street Car Park (Fuuse)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Chaplin Street Car Park (Fuuse)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sm Lower CP1 St Marks EV 2
- Lincoln Transport Hub
- Lucy Tower Street Car Park
- Instavolt, Mc Donalds
- Lucy Tower Multi Story Car Park
- Pod Point Tesco Superstore - Lincoln Canwick Road
- Cheapest nearby
- Pod Point Tesco Superstore - Lincoln Canwick Road · 44.4p per kWh · 50 kW · 0.5 mi
- Fastest nearby
- Instavolt, Mc Donalds · 50 kW · 0.4 mi