BP Pulse · EV charging site
Co-op Heckington
1 High Street, Heckington, Sleaford, NG34 9RA
Co-op Heckington is an EV charging site in Sleaford, Lincolnshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 0% uptime here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Superstore - Sleaford, 5 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT072
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Co-op Heckington (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Co-op Heckington (BP Pulse) have?
2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Co-op Heckington (BP Pulse) open 24/7?
Yes - Co-op Heckington (BP Pulse) is open 24 hours a day, 7 days a week.
When is Co-op Heckington (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around noon. The live status on this page shows what is free before you set off.
How reliable is Co-op Heckington (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Co-op Heckington?
Co-op Heckington is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Co-op Heckington (BP Pulse)?
Pod Point Tesco Superstore - Sleaford is 5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Co-op Heckington (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Heckington (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Co-op Heckington (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.