# Co-op Ruskington Food Store · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-co-op-ruskington-food-store-uk

Co-op Ruskington Food Store is an EV charging site in Sleaford, Lincolnshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS and CHAdeMO. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 63% uptime and recorded 93 charging sessions here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 23:34 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 18 High Street North, Ruskington, NG34 9DY
- **Area:** Sleaford, Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.04653, -0.38443

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed | Out of service |
| CHAdeMO | 50 kW | 1 | Not listed | Out of service |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Co-op Ruskington Food Store (BP Pulse)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Co-op Ruskington Food Store (BP Pulse) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

### Is Co-op Ruskington Food Store (BP Pulse) open 24/7?

Yes - Co-op Ruskington Food Store (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Co-op Ruskington Food Store (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

### How reliable is Co-op Ruskington Food Store (BP Pulse)?

Amp Map measured 63% uptime here from recorded live status over the last 30 days, across 93 observed charging sessions.

### Who operates Co-op Ruskington Food Store?

Co-op Ruskington Food Store is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Co-op Ruskington Food Store (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Ruskington Food Store (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Co-op Ruskington Food Store (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Sleaford](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/sleaford)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Pod Point Tesco Superstore - Sleaford](https://ampmap.co.uk/charger/pod-point-tesco-superstore-sleaford-2-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · 65 Northgate · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-co-op-ruskington-food-store-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
