# Co-op Wybers · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-co-op-wybers-uk

Co-op Wybers is an EV charging site in Grimsby, North East Lincolnshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 98% uptime and recorded 87 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 20:21 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 338 St Nicholas Drive, DN37 9SF
- **Area:** Grimsby, North East Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.56495, -0.13862

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Co-op Wybers (BP Pulse)?

Up to 50 kW DC via CCS.

### How many charging sockets does Co-op Wybers (BP Pulse) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

### Is Co-op Wybers (BP Pulse) open 24/7?

Yes - Co-op Wybers (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Co-op Wybers (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Co-op Wybers (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 87 observed charging sessions.

### Who operates Co-op Wybers?

Co-op Wybers is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Co-op Wybers (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Wybers (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Co-op Wybers (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Grimsby](https://ampmap.co.uk/chargers/united-kingdom/north-east-lincolnshire/grimsby)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [EVC Humber Royal Hotel · Roam Charging](https://ampmap.co.uk/charger/roam-charging-evc-humber-royal-hotel-uk) - Type 2 22 kW · Little Coates Road
- [Morrisons Cleethorpes · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-morrisons-cleethorpes-uk) - CCS 50 kW · Hilmore Rd
- [Beechwood Farm (Grimsby) · evyve](https://ampmap.co.uk/charger/evyve-beechwood-farm-uk) - CCS 75 kW · Village Way · From 85p/kWh
- [Woad Lane](https://ampmap.co.uk/charger/woad-lane-uk) - CCS 50 kW
- [The St. James Hotel · Zero Carbon World](https://ampmap.co.uk/charger/zero-carbon-world-the-st-james-hotel-uk) - Type 2 7 kW · St. James Square
- [Millfields Hotel · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-millfields-hotel-uk) - CCS / CHAdeMO / Type 2 50 kW, Type 2 7 kW · Millfields Hotel, 53 Bargate · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-co-op-wybers-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
