# Co-op Wygate Park · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-co-op-wygate-park-uk

Co-op Wygate Park is an EV charging site in Spalding, Lincolnshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 95% uptime and recorded 59 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 19:50 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 1 Clover Way, Wygate Park, PE11 3GD
- **Area:** Spalding, Lincolnshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.79604, -0.16353

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Co-op Wygate Park (BP Pulse)?

Up to 50 kW DC via CCS.

### How many charging sockets does Co-op Wygate Park (BP Pulse) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

### Is Co-op Wygate Park (BP Pulse) open 24/7?

Yes - Co-op Wygate Park (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Co-op Wygate Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Co-op Wygate Park (BP Pulse)?

Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 59 observed charging sessions.

### Who operates Co-op Wygate Park?

Co-op Wygate Park is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Co-op Wygate Park (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Wygate Park (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Co-op Wygate Park (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Spalding](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/spalding)
- [Cheapest charging in Spalding](https://ampmap.co.uk/chargers/united-kingdom/lincolnshire/spalding/cheapest)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Winfrey Avenue Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-winfrey-avenue-car-park-spalding-uk) - Type 2 7 kW · Winfrey Avenue Car Park, 3 Winfrey Avenue · From 65p/kWh
- [Spalding Retail Park · Be.EV](https://ampmap.co.uk/charger/be-ev-spalding-retail-park-uk) - CCS 300 kW, CCS 75 kW · Spalding Retail Parks Holland Markets · From 77p/kWh
- [Anglia UK](https://ampmap.co.uk/charger/monta-aps-anglia-uk-a-uk) - Type 2 7 kW · Mill Green Rd
- [Victoria Street · Be.EV](https://ampmap.co.uk/charger/incharge-victoria-street-car-park-victoria-street-uk) - Type 2 7 kW · Victoria Steet · From 64p/kWh
- [Herring Lane Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-herring-lane-car-park-uk) - CCS 60 kW · Herring Lane · From 84p/kWh
- [Vine Street · Be.EV](https://ampmap.co.uk/charger/be-ev-vine-street-uk) - Type 2 7 kW · Vine Street · From 64p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-co-op-wygate-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
