BP Pulse · EV charging site
Centre:MK - Silbury Boulevard
Centre:MK - Silbury Avenue, Milton Keynes, MK9 3AE
Centre:MK - Silbury Boulevard is an EV charging site in Milton Keynes, run by BP Pulse. Its 20 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 96% uptime and recorded 586 charging sessions here over the last 30 days. 43 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Secklow Gate (Market Entrance) (BP Pulse), 0.2 miles away.
Status
14 of 20 available
Checking status…
Connectors
CCS · 50 kW
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- BPT238
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
| Type 2 | 7 kW | 65p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Centre:MK - Silbury Boulevard (BP Pulse)?
The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Centre:MK - Silbury Boulevard (BP Pulse)?
Up to 50 kW DC via Type 2, CCS.
How many charging sockets does Centre:MK - Silbury Boulevard (BP Pulse) have?
20 charging sockets: 12 × 7 kW Type 2, 8 × 50 kW CCS. Live per-socket availability is shown on this page.
When is Centre:MK - Silbury Boulevard (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Centre:MK - Silbury Boulevard (BP Pulse)?
Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 586 observed charging sessions.
Who operates Centre:MK - Silbury Boulevard?
Centre:MK - Silbury Boulevard is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Centre:MK - Silbury Boulevard (BP Pulse)?
Secklow Gate (Market Entrance) (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Centre:MK - Silbury Boulevard (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Centre:MK - Silbury Boulevard (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Centre:MK - Silbury Boulevard (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.