Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Duke Street Car Park East

Duke Street Car Park East, Duke St, Bulwell, Hucknall, NG6 8EZ

Duke Street Car Park East is an EV charging site in Hucknall, Nottinghamshire, run by BP Pulse. Its 8 sockets reach up to 50 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 57% uptime and recorded 60 charging sessions here over the last 30 days. 12 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Holborn Place (BP Pulse), 140 yards away.

Status

5 of 8 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 50 kW2 connectors · 89p per kWhOut of service
BPT5000% reliabilityOut of order
BPT5000% reliabilityOut of order
Type 2 · 7 kW6 connectors · 65p per kWh5 free1 out of service
VPP40183170% reliabilityAvailable
VPP401879100% reliabilityAvailable
VPP401885100% reliabilityAvailable
VPP402210100% reliabilityAvailable
VPP4022120% reliabilityOut of order
VPP402214100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
BPT500

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Duke Street Car Park East (BP Pulse)?

The listed price is CCS £0.89/kWh · Type 2 £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Duke Street Car Park East (BP Pulse)?

Up to 50 kW DC via CCS, Type 2.

How many charging sockets does Duke Street Car Park East (BP Pulse) have?

8 charging sockets: 2 × 50 kW CCS, 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Duke Street Car Park East (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is Duke Street Car Park East (BP Pulse)?

Amp Map measured 57% uptime here from recorded live status over the last 30 days, across 60 observed charging sessions.

Who operates Duke Street Car Park East?

Duke Street Car Park East is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Duke Street Car Park East (BP Pulse)?

Holborn Place (BP Pulse) is 140 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Duke Street Car Park East (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Duke Street Car Park East (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Duke Street Car Park East (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.