BP Pulse · EV charging site
East Lindsey Council
East Lindsey Council, Lawn Car Park, Skegness, PE25 3JD
East Lindsey Council is an EV charging site in Skegness, Lincolnshire, run by BP Pulse. All 6 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Amp Map measured 0% uptime here over the last 30 days. 11 other charging sites are listed within a mile, and the nearest site with 50 kW or more is South Parade Skegness (InstaVolt Ltd), 0.3 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- FC18430
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 65p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at East Lindsey Council (BP Pulse)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at East Lindsey Council (BP Pulse)?
Up to 7 kW AC via Type 2.
How many charging sockets does East Lindsey Council (BP Pulse) have?
6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is East Lindsey Council (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates East Lindsey Council?
East Lindsey Council is on the BP Pulse network.
Where is the nearest charger with 50 kW or more to East Lindsey Council (BP Pulse)?
South Parade Skegness (InstaVolt Ltd) is 0.3 miles away in a straight line, with up to 160 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at East Lindsey Council (BP Pulse)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at East Lindsey Council (BP Pulse)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at East Lindsey Council (BP Pulse)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lawn Car Park
- South Parade Skegness
- Morrisons Skegness
- Pod Point Tesco Superstore - Skegness
- East Lindsey District Council
- Princes Parade
- Cheapest nearby
- Pod Point Tesco Superstore - Skegness · 44.4p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- South Parade Skegness · 160 kW · 0.3 mi