BP Pulse · EV charging site
Faygate SF Connect
Faygate Lane, Horsham, RH12 4SH
Faygate SF Connect is an EV charging site in Horsham, West Sussex, run by BP Pulse and open 24 hours a day. Its 6 sockets reach up to 150 kW, with CCS at the top speed. Amp Map measured 0% uptime here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Sussex Barn (Horsham) (evyve), 2.3 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
CHAdeMO · 100 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPU0125
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Faygate SF Connect (BP Pulse)?
Up to 150 kW DC via CHAdeMO, CCS.
How many charging sockets does Faygate SF Connect (BP Pulse) have?
6 charging sockets: 3 × 100 kW CHAdeMO, 3 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Faygate SF Connect (BP Pulse) open 24/7?
Yes - Faygate SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
How reliable is Faygate SF Connect (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Faygate SF Connect?
Faygate SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Faygate SF Connect (BP Pulse)?
Sussex Barn (Horsham) (evyve) is 2.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Faygate SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Faygate SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Faygate SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Preim Limited - Kilnwood Vale
- Sussex Barn (Horsham)
- MFG Shell Ilfield
- EH - MOTO Pease Pottage
- Pease Pottage, UK
- Parham Road 1
- Cheapest nearby
- Pod Point Preim Limited - Kilnwood Vale · 50.4p per kWh · 7 kW · 0.9 mi
- Fastest nearby
- EH - MOTO Pease Pottage · 350 kW · 2.9 mi