# Foley SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-foley-sf-connect-uk

Foley SF Connect is an EV charging site in Aldridge, Walsall, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 95% uptime and recorded 213 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 17:01 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Beacon Hill, Streetly, WS9 0RH
- **Area:** Aldridge, Walsall, United Kingdom
- **Coordinates (latitude, longitude):** 52.58164, -1.90626

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Foley SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Foley SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Foley SF Connect (BP Pulse) open 24/7?

Yes - Foley SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Foley SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

### How reliable is Foley SF Connect (BP Pulse)?

Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 213 observed charging sessions.

### Who operates Foley SF Connect?

Foley SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Foley SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Foley SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Foley SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Aldridge](https://ampmap.co.uk/chargers/united-kingdom/walsall/aldridge)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Foley Arms, Sutton Coldfield · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-foley-arms-uk) - CCS 75 kW, Type 2 7 kW · 293 Foley Road · From 89p/kWh
- [West Way Birmingham Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-west-way-birmingham-nissan-uk) - CHAdeMO 63 kW, BS1363 3 Pin 13 Amp 3 kW · 127 Chester Road
- [Shell Recharge Shell Moorcroft](https://ampmap.co.uk/charger/shell-recharge-shell-moorcroft-uk) - CCS / CHAdeMO 150 kW · Chester Road · From 89p/kWh
- [Morrisons Aldridge · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-aldridge-uk) - CHAdeMO 50 kW, Type 2 50 kW · Wm Morrison Supermarkets PLC
- [ubitricity Distributed Energy Systems UK Ltd. 717 Kings Road](https://ampmap.co.uk/charger/ubitricity-717-kings-road-uk) - Ubitricity · Type 2 5 kW · 717 Kings Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 639 Kings Road](https://ampmap.co.uk/charger/ubitricity-639-kings-road-uk) - Ubitricity · Type 2 5 kW · 639 Kings Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-foley-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
