BP Pulse · EV charging site
Garlinge SF Connect
233 Canterbury Road, Margate, CT9 5JP
Garlinge SF Connect is an EV charging site in Margate, Kent, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 97% uptime and recorded 268 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Market Street Car Park (POGO), 1.4 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000467
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Garlinge SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Garlinge SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Garlinge SF Connect (BP Pulse) open 24/7?
Yes - Garlinge SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
When is Garlinge SF Connect (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Garlinge SF Connect (BP Pulse)?
Amp Map measured 97% uptime here from recorded live status over the last 30 days, across 268 observed charging sessions.
Who operates Garlinge SF Connect?
Garlinge SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Garlinge SF Connect (BP Pulse)?
Market Street Car Park (POGO) is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Garlinge SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Garlinge SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Garlinge SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Market Street Car Park
- Rendezvous Car Park
- Aldi Supermarket
- Albion Road Car Park
- Hooden Horse (Westwood Cross)
- Westwood Cross Shopping Centre
- Cheapest nearby
- Market Street Car Park · 56p per kWh · 50 kW · 1.4 mi