BP Pulse · EV charging site
Grafton Gate East
Grafton Gate East, Central Milton Keynes, MK9 1AT
Grafton Gate East is an EV charging site in Milton Keynes, run by BP Pulse. All 4 of its sockets are 50 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 50% uptime here over the last 30 days. 44 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Elder Gate (BP Pulse), 0.1 miles away.
Status
0 of 4 available
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- BPT386
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Grafton Gate East (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Grafton Gate East (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Grafton Gate East (BP Pulse) have?
4 charging sockets: 4 × 50 kW CCS. Live per-socket availability is shown on this page.
When is Grafton Gate East (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.
How reliable is Grafton Gate East (BP Pulse)?
Amp Map measured 50% uptime here from recorded live status over the last 30 days.
Who operates Grafton Gate East?
Grafton Gate East is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Grafton Gate East (BP Pulse)?
Elder Gate (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Grafton Gate East (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grafton Gate East (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Grafton Gate East (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Elder Gate
- Bank House
- Avebury House
- Lower Fourth Street - Midsummer Boulevard
- Elder Gate Station Car Park
- Bouverie House - Silbury Boulevard
- Cheapest nearby
- Bank House · 65p per kWh · 7 kW · 0.1 mi