Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Green Man

2 High Street, Birmingham, B17 9NE

Green Man is an EV charging site in Birmingham, City and Borough of Birmingham, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 8 am. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is St John's Road Car Park (East) (BP Pulse), 0.1 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW2 connectors2 free
BPT0873Available
BPT0873Available

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPT0873

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Green Man (BP Pulse)?

Up to 50 kW DC via CCS.

How many charging sockets does Green Man (BP Pulse) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Green Man (BP Pulse) open 24/7?

Yes - Green Man (BP Pulse) is open 24 hours a day, 7 days a week.

When is Green Man (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 6 am. The live status on this page shows what is free before you set off.

Who operates Green Man?

Green Man is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Green Man (BP Pulse)?

St John's Road Car Park (East) (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Green Man (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Green Man (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Green Man (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.