BP Pulse · EV charging site
Green Man
2 High Street, Birmingham, B17 9NE
Green Man is an EV charging site in Birmingham, City and Borough of Birmingham, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS. Recorded live status shows it is usually busiest around 8 am. 16 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is St John's Road Car Park (East) (BP Pulse), 0.1 miles away.
Status
2 of 2 available
Checking status…
Connectors
CCS · 50 kW
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPT0873
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Green Man (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Green Man (BP Pulse) have?
2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.
Is Green Man (BP Pulse) open 24/7?
Yes - Green Man (BP Pulse) is open 24 hours a day, 7 days a week.
When is Green Man (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 6 am. The live status on this page shows what is free before you set off.
Who operates Green Man?
Green Man is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Green Man (BP Pulse)?
St John's Road Car Park (East) (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Green Man (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Green Man (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Green Man (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- St John's Road Car Park (East)
- ubitricity Distributed Energy Systems UK Ltd. 58 Rose Road
- ubitricity Distributed Energy Systems UK Ltd. 68 Rose Road
- ubitricity Distributed Energy Systems UK Ltd. 46 Rose Road
- ubitricity Distributed Energy Systems UK Ltd. 20 Rose Road
- On-street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 58 Rose Road · 56p per kWh · 5 kW · 0.3 mi