Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Grove Street Car Park

Grove Street Car Park, Grove Street, Derby, DE23 6UR

Grove Street Car Park is an EV charging site in Derby, run by BP Pulse. Its 10 sockets reach up to 180 kW, with CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 9% uptime and recorded 10 charging sessions here over the last 30 days. 15 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Southgate Retail Park - PoGo, 0.1 miles away.

Status

1 of 10 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 180 kW2 connectors · 89p per kWhOut of service
BPA02200% reliabilityOut of order
BPA02200% reliabilityOut of order
CHAdeMO · 120 kW1 connector · 89p per kWhOut of service
BPA02200% reliabilityOut of order
CCS · 50 kW4 connectors · 89p per kWhOut of service
BPT5400% reliabilityOut of order
BPT5400% reliabilityOut of order
BPT5410% reliabilityOut of order
BPT5420% reliabilityOut of order
CHAdeMO · 50 kW2 connectors · 89p per kWhOut of service
BPT5410% reliabilityOut of order
BPT5420% reliabilityOut of order
Type 2 · 7 kW1 connector · 65p per kWh1 free
VPP401908100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
BPT540

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS180 kW89p per kWh
CHAdeMO120 kW89p per kWh
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 180 kW CCS~24 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 180 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 180 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 180 kW CCS~20 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 180 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 180 kW CCS~39 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 120 kW CHAdeMO~54 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Grove Street Car Park (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · CHAdeMO £0.89/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Grove Street Car Park (BP Pulse)?

Up to 180 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Grove Street Car Park (BP Pulse) have?

10 charging sockets: 1 × 7 kW Type 2, 4 × 50 kW CCS, 2 × 50 kW CHAdeMO, 1 × 120 kW CHAdeMO, 2 × 180 kW CCS. Live per-socket availability is shown on this page.

When is Grove Street Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 3 pm. The live status on this page shows what is free before you set off.

How reliable is Grove Street Car Park (BP Pulse)?

Amp Map measured 9% uptime here from recorded live status over the last 30 days, across 10 observed charging sessions.

Who operates Grove Street Car Park?

Grove Street Car Park is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Grove Street Car Park (BP Pulse)?

Southgate Retail Park - PoGo is 0.1 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Grove Street Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 180 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Grove Street Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 23 min on the 180 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Grove Street Car Park (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 180 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.