# Haberden SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-haberden-sf-connect-uk

Haberden SF Connect is an EV charging site in Bury St Edmunds, Suffolk, run by BP Pulse. Both of its sockets are 150 kW CCS, and the published price is £0.89 per kWh. Amp Map measured 0% uptime here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 19:54 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Haberden SF Connect, Rougham Road, IP33 2RN
- **Area:** Bury St Edmunds, Suffolk, United Kingdom
- **Coordinates (latitude, longitude):** 52.23701, 0.72808

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | £0.89/kWh | Out of service |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Not published
- **Payment:** In the BP Pulse app; RFID card

## Common questions

### How much does it cost to charge at Haberden SF Connect (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Haberden SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Haberden SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### How reliable is Haberden SF Connect (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

### Who operates Haberden SF Connect?

Haberden SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Haberden SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Haberden SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Haberden SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bury St Edmunds](https://ampmap.co.uk/chargers/united-kingdom/suffolk/bury-st-edmunds)
- [Cheapest charging in Bury St Edmunds](https://ampmap.co.uk/chargers/united-kingdom/suffolk/bury-st-edmunds/cheapest)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Southgate Green · Evolt](https://ampmap.co.uk/charger/evolt-network-southgate-green-uk) - Type 2 22 kW · Southgate Green
- [Pod Point Creative Car Park Ltd](https://ampmap.co.uk/charger/pod-point-creative-car-park-ltd-uk) - Type 2 7 kW · Symonds Road · From 69.6p/kWh
- [Maynewater Lane · Evolt](https://ampmap.co.uk/charger/evolt-network-maynewater-lane-uk) - Type 2 4 kW · Maynewater Lane
- [ubitricity Distributed Energy Systems UK Ltd. 21 Southgate Street](https://ampmap.co.uk/charger/ubitricity-21-southgate-street-uk) - Ubitricity · Type 2 5 kW · 21 Southgate Street · From 45p/kWh
- [Southgate Street · Evolt](https://ampmap.co.uk/charger/evolt-southgate-street-uk) - Type 2 4 kW · Southgate Street
- [Sparhawk Street · Evolt](https://ampmap.co.uk/charger/evolt-network-sparhawk-street-uk) - Type 2 4 kW · Sparhawk Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-haberden-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
