Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Harvester George Stephenson Ave

Harvester George Stephenson Ave, Walsall, WS2 7EU

Harvester George Stephenson Ave is an EV charging site in Walsall, run by BP Pulse and open 24 hours a day. Both of its sockets are 50 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 92% uptime and recorded 54 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Walsall, 1 mile away.

Status

Out of service

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 50 kW2 connectors · 89p per kWhOut of service
BPT086951% reliabilityOut of order
BPT086951% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPT0869

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Harvester George Stephenson Ave (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Harvester George Stephenson Ave (BP Pulse)?

Up to 50 kW DC via CCS.

How many charging sockets does Harvester George Stephenson Ave (BP Pulse) have?

2 charging sockets: 2 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Harvester George Stephenson Ave (BP Pulse) open 24/7?

Yes - Harvester George Stephenson Ave (BP Pulse) is open 24 hours a day, 7 days a week.

When is Harvester George Stephenson Ave (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Harvester George Stephenson Ave (BP Pulse)?

Amp Map measured 92% uptime here from recorded live status over the last 30 days, across 54 observed charging sessions.

Who operates Harvester George Stephenson Ave?

Harvester George Stephenson Ave is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Harvester George Stephenson Ave (BP Pulse)?

Pod Point Tesco Extra - Walsall is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Harvester George Stephenson Ave (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Harvester George Stephenson Ave (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Harvester George Stephenson Ave (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.