BP Pulse · EV charging site
Honiton SF Connect
Turks Head Lane, Honiton, EX14 1BQ
Honiton SF Connect is an EV charging site in Honiton, Devon, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Amp Map measured 0% uptime here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Heron Farm (InstaVolt Ltd), 0.5 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000087
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Honiton SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Honiton SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Honiton SF Connect (BP Pulse) open 24/7?
Yes - Honiton SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
How reliable is Honiton SF Connect (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Honiton SF Connect?
Honiton SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Honiton SF Connect (BP Pulse)?
Heron Farm (InstaVolt Ltd) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Honiton SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Honiton SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Honiton SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Tesco Superstore - Honiton · 44.4p per kWh · 7 kW · 0.4 mi