# Honiton SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-honiton-sf-connect-uk

Honiton SF Connect is an EV charging site in Honiton, Devon, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Amp Map measured 0% uptime here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 18:04 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Turks Head Lane, EX14 1BQ
- **Area:** Honiton, Devon, United Kingdom
- **Coordinates (latitude, longitude):** 50.79549, -3.20645

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | Out of service |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Honiton SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Honiton SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Honiton SF Connect (BP Pulse) open 24/7?

Yes - Honiton SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### How reliable is Honiton SF Connect (BP Pulse)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

### Who operates Honiton SF Connect?

Honiton SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Honiton SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Honiton SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Honiton SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Honiton](https://ampmap.co.uk/chargers/united-kingdom/devon/honiton)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Pod Point Tesco Superstore - Honiton](https://ampmap.co.uk/charger/pod-point-tesco-superstore-honiton-uk) - Type 2 7 kW · Battishorne Way · From 44.4p/kWh
- [Heron Farm · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-heron-farm-uk) - CCS 50 kW, CHAdeMO 50 kW · 1 Weston Lane
- [Heartstone Inns Ltd](https://ampmap.co.uk/charger/heartstone-inns-ltd-4-uk) - Type 2 7 kW · Hare & Hounds
- [Pod Point Little Gosford Farm Shop](https://ampmap.co.uk/charger/pod-point-little-gosford-farm-uk) - Type 2 7 kW · Gosford Road · From 51.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-honiton-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
