# Hove SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-hove-sf-connect-uk

Hove SF Connect is an EV charging site in Portslade, Brighton and Hove, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 25% uptime and recorded 86 charging sessions here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 18:45 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 373 Kingsway, BN3 4QD
- **Area:** Portslade, Brighton and Hove, United Kingdom
- **Coordinates (latitude, longitude):** 50.82944, -0.20479

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | Out of service |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Hove SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Hove SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Hove SF Connect (BP Pulse) open 24/7?

Yes - Hove SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Hove SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 10 pm. The live status on this page shows what is free before you set off.

### How reliable is Hove SF Connect (BP Pulse)?

Amp Map measured 25% uptime here from recorded live status over the last 30 days, across 86 observed charging sessions.

### Who operates Hove SF Connect?

Hove SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Hove SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hove SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Hove SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Portslade](https://ampmap.co.uk/chargers/united-kingdom/brighton-and-hove/portslade)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [05846 Erroll Road · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05846-erroll-road-uk) - Type 2 4 kW · Erroll Road
- [Pod Point BEC - Shoreham Port - Maritime House](https://ampmap.co.uk/charger/pod-point-bec-shoreham-port-maritime-house-uk) - Type 2 7 kW · Basin Road North · From 39.6p/kWh
- [05905 St. Leonard's Road · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05905-st-leonard-s-road-uk) - Type 2 4 kW · St. Leonard's Road
- [05794 Erroll Road · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05794-erroll-road-uk) - Type 2 4 kW · Erroll Road
- [Pod Point Ferry Wharf](https://ampmap.co.uk/charger/pod-point-ferry-wharf-uk) - Type 2 7 kW · North Basin Road Port Slade · From 60p/kWh
- [05812 Leicester Villas · Blink Charging](https://ampmap.co.uk/charger/blink-charging-05812-leicester-villas-uk) - Type 2 4 kW · Leicester Villas

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-hove-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.