# HRL Glenwell · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-hrl-glenwell-uk

HRL Glenwell is an EV charging site in Newtownabbey, Antrim and Newtownabbey, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 89% uptime and recorded 288 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 17:40 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 290 Antrim Rd, Glengormley, BT36 7QN
- **Area:** Newtownabbey, Antrim and Newtownabbey, United Kingdom
- **Coordinates (latitude, longitude):** 54.66970, -5.95702

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | 2 free |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at HRL Glenwell (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does HRL Glenwell (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is HRL Glenwell (BP Pulse) open 24/7?

Yes - HRL Glenwell (BP Pulse) is open 24 hours a day, 7 days a week.

### When is HRL Glenwell (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is HRL Glenwell (BP Pulse)?

Amp Map measured 89% uptime here from recorded live status over the last 30 days, across 288 observed charging sessions.

### Who operates HRL Glenwell?

HRL Glenwell is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at HRL Glenwell (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Glenwell (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at HRL Glenwell (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newtownabbey](https://ampmap.co.uk/chargers/united-kingdom/antrim-and-newtownabbey/newtownabbey)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [DRD Carpark, Farmley Road · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-drd-carpark-farmley-road-uk) - Type 2 22 kW · 6 Farmley Road
- [NBAS Chartered Accountants · Weev](https://ampmap.co.uk/charger/weev-nbas-chartered-accountants-uk) - Type 2 7 kW · 17 Carnmoney Rd
- [Belfast Zoo](https://ampmap.co.uk/charger/belfast-zoo-uk) - Type 2 7 kW
- [Mallusk Enterprise Park · Weev](https://ampmap.co.uk/charger/weev-mallusk-enterprise-park-uk) - Type 2 22 kW · Mallusk Drive
- [Valley Leisure Centre · ESB Ecars](https://ampmap.co.uk/charger/esb-ecars-valley-leisure-centre-uk) - Type 2 22 kW · 40 Church Road
- [Central Park · Weev](https://ampmap.co.uk/charger/weev-central-park-uk) - CCS 120 kW · Mallusk Rd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-hrl-glenwell-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
