BP Pulse · EV charging site
HRL Lagan Valley
75-81 Hillsborough Road, Lisburn, BT28 1JN
HRL Lagan Valley is an EV charging site in Lisburn, Lisburn and Castlereagh, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 10 am. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is M&S Lisburn (BP Pulse), 0.9 miles away.
Status
Not reporting
Checking status…
Connectors
CCS · 150 kW
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000306
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at HRL Lagan Valley (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does HRL Lagan Valley (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is HRL Lagan Valley (BP Pulse) open 24/7?
Yes - HRL Lagan Valley (BP Pulse) is open 24 hours a day, 7 days a week.
When is HRL Lagan Valley (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 6 am. The live status on this page shows what is free before you set off.
Who operates HRL Lagan Valley?
HRL Lagan Valley is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to HRL Lagan Valley (BP Pulse)?
M&S Lisburn (BP Pulse) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HRL Lagan Valley (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Lagan Valley (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HRL Lagan Valley (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lagan Valley Hospital
- Lisburn Bowl
- DRD Car Park, Benson Street
- Dobbies Garden World
- Pod Point Tesco Superstore - Lisburn Bentrim Road
- M&S Lisburn
- Cheapest nearby
- Pod Point Tesco Superstore - Lisburn Bentrim Road · 44.4p per kWh · 7 kW · 0.9 mi