BP Pulse · EV charging site
HRL Maghaberry
Wellington Parks, Lisburn, BT67 0QN
HRL Maghaberry is an EV charging site in Lisburn, Lisburn and Castlereagh, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 0% uptime here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Glenavy Road (BP Pulse), 1.2 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000301
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at HRL Maghaberry (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does HRL Maghaberry (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is HRL Maghaberry (BP Pulse) open 24/7?
Yes - HRL Maghaberry (BP Pulse) is open 24 hours a day, 7 days a week.
When is HRL Maghaberry (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is HRL Maghaberry (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates HRL Maghaberry?
HRL Maghaberry is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to HRL Maghaberry (BP Pulse)?
Glenavy Road (BP Pulse) is 1.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HRL Maghaberry (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Maghaberry (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HRL Maghaberry (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.