BP Pulse · EV charging site
HRL Millburn Road
Millburn Road, Coleraine, BT52 1QY
HRL Millburn Road is an EV charging site in Coleraine, Causeway Coast and Glens, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is ibis Coleraine (EZO (IE)), 1.3 miles away.
Status
Not reporting
Checking status…
Connectors
CCS · 150 kW
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at HRL Millburn Road (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does HRL Millburn Road (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is HRL Millburn Road (BP Pulse) open 24/7?
Yes - HRL Millburn Road (BP Pulse) is open 24 hours a day, 7 days a week.
Who operates HRL Millburn Road?
HRL Millburn Road is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to HRL Millburn Road (BP Pulse)?
ibis Coleraine (EZO (IE)) is 1.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HRL Millburn Road (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Millburn Road (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HRL Millburn Road (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.