BP Pulse · EV charging site
HRL Route
8 Ballybogey Road, Coleraine, BT53 6QD
HRL Route is an EV charging site in Coleraine, Causeway Coast and Glens, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 0% uptime here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Basil Knipe Electrics (Monta), 1.5 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000668
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at HRL Route (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does HRL Route (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is HRL Route (BP Pulse) open 24/7?
Yes - HRL Route (BP Pulse) is open 24 hours a day, 7 days a week.
When is HRL Route (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is HRL Route (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates HRL Route?
HRL Route is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to HRL Route (BP Pulse)?
Basil Knipe Electrics (Monta) is 1.5 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at HRL Route (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HRL Route (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at HRL Route (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.