Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

JLR Retailer - Pentland Elgin

JLR Retailer - Pentland Elgin, Moycroft Indus, IV30 1XZ

JLR Retailer - Pentland Elgin is an EV charging site in Elgin, Moray, run by BP Pulse. Both of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 84% uptime and recorded 69 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ladyhill Road Car Park (Chargeplace Scotland), 1.1 miles away.

Status

1 of 2 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 65p per kWh1 free1 in use
1088184% reliabilityAvailable
1088184% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
10881

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at JLR Retailer - Pentland Elgin (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at JLR Retailer - Pentland Elgin (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does JLR Retailer - Pentland Elgin (BP Pulse) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is JLR Retailer - Pentland Elgin (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 9 am. The live status on this page shows what is free before you set off.

How reliable is JLR Retailer - Pentland Elgin (BP Pulse)?

Amp Map measured 84% uptime here from recorded live status over the last 30 days, across 69 observed charging sessions.

Who operates JLR Retailer - Pentland Elgin?

JLR Retailer - Pentland Elgin is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to JLR Retailer - Pentland Elgin (BP Pulse)?

Ladyhill Road Car Park (Chargeplace Scotland) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at JLR Retailer - Pentland Elgin (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at JLR Retailer - Pentland Elgin (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at JLR Retailer - Pentland Elgin (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.