Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Jubilee Retail Park

Unit 6, Jubilee Close Retail Park, Weymouth, DT4 7BG

Jubilee Retail Park is an EV charging site in Weymouth, Dorset, run by BP Pulse and open 24 hours a day. All 4 of its sockets are 50 kW CHAdeMO and CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 98% uptime and recorded 95 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is KFC Weymouth (InstaVolt Ltd), 100 yards away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 50 kW3 connectors · 89p per kWh3 free
BPT52598% reliabilityAvailable
BPT52598% reliabilityAvailable
BPT76898% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 89p per kWh1 free
BPT76898% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPT525

Always check directly with the charge point operator for the most up-to-date information.

Prices

89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Jubilee Retail Park (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Jubilee Retail Park (BP Pulse)?

Up to 50 kW DC via CHAdeMO, CCS.

How many charging sockets does Jubilee Retail Park (BP Pulse) have?

4 charging sockets: 1 × 50 kW CHAdeMO, 3 × 50 kW CCS. Live per-socket availability is shown on this page.

Is Jubilee Retail Park (BP Pulse) open 24/7?

Yes - Jubilee Retail Park (BP Pulse) is open 24 hours a day, 7 days a week.

When is Jubilee Retail Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Jubilee Retail Park (BP Pulse)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 95 observed charging sessions.

Who operates Jubilee Retail Park?

Jubilee Retail Park is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Jubilee Retail Park (BP Pulse)?

KFC Weymouth (InstaVolt Ltd) is 100 yards away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Jubilee Retail Park (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jubilee Retail Park (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Jubilee Retail Park (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.