Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Lancaster Park and Ride Caton

Lancaster Park and RIde, Caton Road, LA1 3SW

Lancaster Park and Ride Caton is an EV charging site in Lancaster, Lancashire, run by BP Pulse. Its 18 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 79% uptime and recorded 281 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Holiday Inn Lancaster (POGO), 0.3 miles away.

Status

11 of 18 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS or CHAdeMO or Type 2 · 50 kW6 connectors · 89p per kWh1 free5 out of service
2449783% reliabilityOut of order
2450083% reliabilityOut of order
2450383% reliabilityOut of order
2450584% reliabilityOut of order
24506100% reliabilityAvailable
2450984% reliabilityOut of order
Type 2 · 7 kW12 connectors · 65p per kWh10 free2 out of service
12094100% reliabilityAvailable
12094100% reliabilityAvailable
12095100% reliabilityAvailable
12095100% reliabilityAvailable
12096100% reliabilityAvailable
12096100% reliabilityAvailable
1209796% reliabilityAvailable
1209796% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
12094

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 244 kW89p per kWh
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Lancaster Park and Ride Caton (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Lancaster Park and Ride Caton (BP Pulse)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Lancaster Park and Ride Caton (BP Pulse) have?

18 charging sockets: 12 × 7 kW Type 2, 6 × 50 kW CCS, 6 × 50 kW CHAdeMO, 6 × 44 kW Type 2. Live per-socket availability is shown on this page.

When is Lancaster Park and Ride Caton (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Lancaster Park and Ride Caton (BP Pulse)?

Amp Map measured 79% uptime here from recorded live status over the last 30 days, across 281 observed charging sessions.

Who operates Lancaster Park and Ride Caton?

Lancaster Park and Ride Caton is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Lancaster Park and Ride Caton (BP Pulse)?

Holiday Inn Lancaster (POGO) is 0.3 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Lancaster Park and Ride Caton (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lancaster Park and Ride Caton (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Lancaster Park and Ride Caton (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.