BP Pulse · EV charging site
Lightwater SF Connect
66 Guildford Road, Camberley, GU18 5SD
Lightwater SF Connect is an EV charging site in Camberley, Surrey, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Amp Map measured 0% uptime here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Gordon SF Connect (BP Pulse), 1.3 miles away.
Status
Out of service
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Open 24 hours
- Payment
- Bank card at the chargerIn the BP Pulse appRFID card
- Charger ID
- BPG000131
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Lightwater SF Connect (BP Pulse)?
Up to 150 kW DC via CCS.
How many charging sockets does Lightwater SF Connect (BP Pulse) have?
2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.
Is Lightwater SF Connect (BP Pulse) open 24/7?
Yes - Lightwater SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.
How reliable is Lightwater SF Connect (BP Pulse)?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Lightwater SF Connect?
Lightwater SF Connect is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Lightwater SF Connect (BP Pulse)?
Gordon SF Connect (BP Pulse) is 1.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lightwater SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lightwater SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lightwater SF Connect (BP Pulse)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Macs Automobile Service Ltd
- Gordon SF Connect
- Windlesham Golf Club
- RAW Greene King King's Arms 1
- Bagshot SF Connect
- Pennyhill Park Hotel and The Spa
- Cheapest nearby
- Pod Point Macs Automobile Service Ltd · 99.6p per kWh · 7 kW · 1.1 mi