BP Pulse · EV charging site
CO-OP Old Leake
CO-OP Old Leake, Meadow Way, Boston, PE22 9JT
CO-OP Old Leake is an EV charging site in Boston, Lincolnshire, run by BP Pulse. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 37 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Co-op Skirbeck Road (BP Pulse), 6.3 miles away.
Status
1 of 1 available
Checking status…
Connectors
CCS or CHAdeMO or Type 2 · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 24383
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
| CHAdeMO | 50 kW | 89p per kWh |
| Type 2 | 44 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at CO-OP Old Leake (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at CO-OP Old Leake (BP Pulse)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does CO-OP Old Leake (BP Pulse) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 44 kW Type 2. Live per-socket availability is shown on this page.
When is CO-OP Old Leake (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is CO-OP Old Leake (BP Pulse)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 37 observed charging sessions.
Who operates CO-OP Old Leake?
CO-OP Old Leake is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to CO-OP Old Leake (BP Pulse)?
Co-op Skirbeck Road (BP Pulse) is 6.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at CO-OP Old Leake (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at CO-OP Old Leake (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at CO-OP Old Leake (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.