# Littleport SF Connect · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-littleport-sf-connect-uk

Littleport SF Connect is an EV charging site in Ely, Cambridgeshire, run by BP Pulse and open 24 hours a day. Both of its sockets are 150 kW CCS. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 37% uptime and recorded 42 charging sessions here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 21:21 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Wisbech Road, CB6 1JJ
- **Area:** Ely, Cambridgeshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.46239, 0.28718

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 2 | Not listed | Out of service |

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the BP Pulse app; RFID card

## Common questions

### How fast is charging at Littleport SF Connect (BP Pulse)?

Up to 150 kW DC via CCS.

### How many charging sockets does Littleport SF Connect (BP Pulse) have?

2 charging sockets: 2 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Littleport SF Connect (BP Pulse) open 24/7?

Yes - Littleport SF Connect (BP Pulse) is open 24 hours a day, 7 days a week.

### When is Littleport SF Connect (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Littleport SF Connect (BP Pulse)?

Amp Map measured 37% uptime here from recorded live status over the last 30 days, across 42 observed charging sessions.

### Who operates Littleport SF Connect?

Littleport SF Connect is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Littleport SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Littleport SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Littleport SF Connect (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ely](https://ampmap.co.uk/chargers/united-kingdom/cambridgeshire/ely)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Pod Point Princess of Wales Hospital](https://ampmap.co.uk/charger/pod-point-princess-of-wales-hospital-uk) - Type 2 7 kW · Lynn Road · From 60p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-littleport-sf-connect-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
