Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

M&S Brooklands

Barnes Wallis Drive, Brooklands, Weybridge, KT13 0XF

M&S Brooklands is an EV charging site in Weybridge, Surrey, run by BP Pulse and open 24 hours a day. Its 18 sockets reach up to 300 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 73% uptime and recorded 2067 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Extra - Brooklands, 140 yards away.

Status

11 of 18 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW4 connectors2 free2 out of service
BPA017483% reliabilityAvailable
BPA017483% reliabilityAvailable
BPA017560% reliabilityOut of order
BPA017560% reliabilityOut of order
CHAdeMO · 100 kW2 connectors1 free1 out of service
BPA017483% reliabilityAvailable
BPA017560% reliabilityOut of order
CCS · 50 kW6 connectors4 free2 out of service
BPT20695% reliabilityAvailable
BPT20753% reliabilityOut of order
BPT20899% reliabilityAvailable
BPT20959% reliabilityAvailable
BPT2100% reliabilityOut of order
BPT21184% reliabilityAvailable
CHAdeMO · 50 kW6 connectors4 free2 out of service
BPT20695% reliabilityAvailable
BPT20753% reliabilityOut of order
BPT20899% reliabilityAvailable
BPT20959% reliabilityAvailable
BPT2100% reliabilityOut of order
BPT21184% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPT206

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at M&S Brooklands (BP Pulse)?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does M&S Brooklands (BP Pulse) have?

18 charging sockets: 4 × 300 kW CCS, 6 × 50 kW CHAdeMO, 2 × 100 kW CHAdeMO, 6 × 50 kW CCS. Live per-socket availability is shown on this page.

Is M&S Brooklands (BP Pulse) open 24/7?

Yes - M&S Brooklands (BP Pulse) is open 24 hours a day, 7 days a week.

When is M&S Brooklands (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is M&S Brooklands (BP Pulse)?

Amp Map measured 73% uptime here from recorded live status over the last 30 days, across 2067 observed charging sessions.

Who operates M&S Brooklands?

M&S Brooklands is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to M&S Brooklands (BP Pulse)?

Pod Point Tesco Extra - Brooklands is 140 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at M&S Brooklands (BP Pulse)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M&S Brooklands (BP Pulse)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at M&S Brooklands (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.