Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

M&S Camberley

The Meadows, Marshall Road, Sandhurst, GU47 0FD

M&S Camberley is an EV charging site in Sandhurst, Bracknell Forest, run by BP Pulse and open 24 hours a day. Its 15 sockets reach up to 300 kW, with CCS at the top speed. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 95% uptime and recorded 990 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Basepoint Camberley (Be.EV), 0.7 miles away.

Status

14 of 15 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 300 kW2 connectors2 free
BPA006690% reliabilityAvailable
BPA006690% reliabilityAvailable
CHAdeMO · 100 kW1 connector1 free
BPA006690% reliabilityAvailable
CCS · 50 kW6 connectors6 free
BPT34295% reliabilityAvailable
BPT34386% reliabilityAvailable
BPT34488% reliabilityAvailable
BPT34598% reliabilityAvailable
BPT34690% reliabilityAvailable
BPT34797% reliabilityAvailable
CHAdeMO · 50 kW6 connectors5 free1 out of service
BPT34295% reliabilityOut of order
BPT34386% reliabilityAvailable
BPT34488% reliabilityAvailable
BPT34598% reliabilityAvailable
BPT34690% reliabilityAvailable
BPT34797% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the BP Pulse appRFID card
Charger ID
BPT342

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at M&S Camberley (BP Pulse)?

Up to 300 kW DC via CCS, CHAdeMO.

How many charging sockets does M&S Camberley (BP Pulse) have?

15 charging sockets: 6 × 50 kW CCS, 2 × 300 kW CCS, 6 × 50 kW CHAdeMO, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

Is M&S Camberley (BP Pulse) open 24/7?

Yes - M&S Camberley (BP Pulse) is open 24 hours a day, 7 days a week.

When is M&S Camberley (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is M&S Camberley (BP Pulse)?

Amp Map measured 95% uptime here from recorded live status over the last 30 days, across 990 observed charging sessions.

Who operates M&S Camberley?

M&S Camberley is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to M&S Camberley (BP Pulse)?

Basepoint Camberley (Be.EV) is 0.7 miles away in a straight line, with up to 60 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at M&S Camberley (BP Pulse)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at M&S Camberley (BP Pulse)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at M&S Camberley (BP Pulse)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.