# Secklow Gate (Market Entrance) · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-midsummer-blvd-secklow-gate-car-park-uk

Secklow Gate (Market Entrance) is an EV charging site in Milton Keynes, run by BP Pulse. Its 8 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 49% uptime and recorded 38 charging sessions here over the last 30 days.

## Status

4 of 8 open at 22 Nov 2026, 20:18 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Secklow Gate, Midsummer Bou, MK9 3NE
- **Area:** Milton Keynes, United Kingdom
- **Coordinates (latitude, longitude):** 52.04284, -0.75291

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 2 | £0.89/kWh | Out of service |
| CHAdeMO | 50 kW | 2 | £0.89/kWh | Out of service |
| Type 2 | 7 kW | 4 | £0.65/kWh | 4 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Not published
- **Payment:** In the BP Pulse app; RFID card

## Common questions

### How much does it cost to charge at Secklow Gate (Market Entrance) (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CHAdeMO £0.89/kWh · CCS £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Secklow Gate (Market Entrance) (BP Pulse)?

Up to 50 kW DC via Type 2, CHAdeMO, CCS.

### How many charging sockets does Secklow Gate (Market Entrance) (BP Pulse) have?

8 charging sockets: 4 × 7 kW Type 2, 2 × 50 kW CHAdeMO, 2 × 50 kW CCS. Live per-socket availability is shown on this page.

### When is Secklow Gate (Market Entrance) (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Secklow Gate (Market Entrance) (BP Pulse)?

Amp Map measured 49% uptime here from recorded live status over the last 30 days, across 38 observed charging sessions.

### Who operates Secklow Gate (Market Entrance)?

Secklow Gate (Market Entrance) is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Secklow Gate (Market Entrance) (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Secklow Gate (Market Entrance) (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Secklow Gate (Market Entrance) (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Milton Keynes](https://ampmap.co.uk/chargers/united-kingdom/milton-keynes/milton-keynes)
- [Cheapest charging in Milton Keynes](https://ampmap.co.uk/chargers/united-kingdom/milton-keynes/milton-keynes/cheapest)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Secklow Gate (Theatre Side) · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-midsummer-boulevard-uk) - Type 2 7 kW · Secklow Gate, Midsummer Boulev · From 65p/kWh
- [Former Iceland Building · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-iceland-milton-keynes-uk) - Type 2 7 kW · Former Iceland Building, 716 Avebury Blvd, Mi · From 65p/kWh
- [Outside Milton Keynes Post Office · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-midsummer-boulevard-outside-post-office-uk) - Type 2 7 kW · Outside Milton Keynes Post Office, 802 Midsum · From 65p/kWh
- [Avebury Boulevard · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-grove-theatre-uk) - CCS 50 kW · Avebury Boulevard · From 89p/kWh
- [John Lewis - Midsummer Boulevard · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-midsummer-boulevard-area-e2-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Outside John Lewis, Midsummer Boulevard · From 65p/kWh
- [Centre:MK - Silbury Boulevard · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-curry-digital-mk73-uk) - CCS 50 kW, Type 2 7 kW · Centre:MK - Silbury Avenue · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-midsummer-blvd-secklow-gate-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
