# Miller & Carter Cannock · BP Pulse

Web page: https://ampmap.co.uk/charger/bp-pulse-miller-and-carter-cannock-uk

Miller & Carter Cannock is an EV charging site in Cannock, Staffordshire, run by BP Pulse. Both of its sockets are 50 kW CCS and CHAdeMO, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 99% uptime and recorded 14 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 20:12 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Miller & Carter Cannock, Litchfield Road, M, WS11 8EE
- **Area:** Cannock, Staffordshire, United Kingdom
- **Coordinates (latitude, longitude):** 52.68703, -2.01993

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 50 kW | 1 | £0.89/kWh | 1 free |
| CHAdeMO | 50 kW | 1 | £0.89/kWh | 1 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** BP Pulse
- **Opening hours:** Not published
- **Payment:** In the BP Pulse app; RFID card

## Common questions

### How much does it cost to charge at Miller & Carter Cannock (BP Pulse)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Miller & Carter Cannock (BP Pulse)?

Up to 50 kW DC via CCS, CHAdeMO.

### How many charging sockets does Miller & Carter Cannock (BP Pulse) have?

2 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

### When is Miller & Carter Cannock (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around noon. The live status on this page shows what is free before you set off.

### How reliable is Miller & Carter Cannock (BP Pulse)?

Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 14 observed charging sessions.

### Who operates Miller & Carter Cannock?

Miller & Carter Cannock is on the BP Pulse network.

### How long does a Tesla Model Y Long Range take to charge at Miller & Carter Cannock (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Miller & Carter Cannock (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Miller & Carter Cannock (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Cannock](https://ampmap.co.uk/chargers/united-kingdom/staffordshire/cannock)
- [Cheapest charging in Cannock](https://ampmap.co.uk/chargers/united-kingdom/staffordshire/cannock/cheapest)
- [BP Pulse chargers](https://ampmap.co.uk/networks/bp-pulse)

## Chargers near this site

- [Cannock, UK · Tesla](https://ampmap.co.uk/charger/tesla-cannock-uk-uk) - CCS 250 kW · West Midlands Designer Outlet, Eastern Way · From 29p/kWh
- [MacArthur Glen Designer Outlet Cannock · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-macarthur-glen-designer-outlet-cannock-uk) - Type 2 22 kW · Eastern Way
- [Morrisons Cannock · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-cannock-uk) - CCS 50 kW, CHAdeMO 50 kW · 63 Mill Street
- [Newhall Farm, Cannock · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-newhall-farm-uk) - CCS 75 kW, CHAdeMO 50 kW · Lichfield Road · From 89p/kWh
- [Brindley Nissan · Nissan UK Dealer Network](https://ampmap.co.uk/charger/nissan-uk-dealer-network-brindley-nissan-uk) - Type 2 7 kW · Delta Way
- [Pod Point Tesco Superstore - Cannock](https://ampmap.co.uk/charger/pod-point-tesco-superstore-cannock-2-uk) - CCS / CHAdeMO 50 kW, Type 2 22 kW · Hawks Green District Centre Hayes Way · From 44.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/bp-pulse-miller-and-carter-cannock-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: BP Pulse (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
