BP Pulse · EV charging site
Miller and Carter
Miller and Carter, Providence Hill, Hedge End, SO31 8DW
Miller and Carter is an EV charging site in Hedge End, Hampshire, run by BP Pulse. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 98% uptime and recorded 166 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Antelope Retail Park (InstaVolt Ltd), 1.2 miles away.
Status
Out of service
Checking status…
Connectors
CCS or CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 24402
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
| CHAdeMO | 50 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Miller and Carter (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Miller and Carter (BP Pulse)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does Miller and Carter (BP Pulse) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
When is Miller and Carter (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Miller and Carter (BP Pulse)?
Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 166 observed charging sessions.
Who operates Miller and Carter?
Miller and Carter is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Miller and Carter (BP Pulse)?
Antelope Retail Park (InstaVolt Ltd) is 1.2 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Miller and Carter (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Miller and Carter (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Miller and Carter (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Southampton
- Antelope Retail Park
- Pod Point Premier Marinas - Swanwick
- Co-op Food
- NATS Southampton
- Manor Farm
- Cheapest nearby
- Pod Point Tesco Extra - Southampton · 44.4p per kWh · 7 kW · 140 yd
- Fastest nearby
- Co-op Food · 160 kW · 1.4 mi